facilit8 ยท Digital Transformation ยท Senior PL Edition

Harmonise the Lead:
The Senior Project Leader Playbook
for Lead Generation & Market Adoption

A structured response to the interview case โ€” covering problem approach, workplan, stakeholder engagement, impact case, and sustainable integration โ€” across a 16-week pilot in 3 markets.

Role guide: PL / You Market Teams Both CCO / Sponsor
v6 โ€” facilit8 ยท Digital Transformation Series ยท 2026 ยท Impact Case tab 3 ยท Partner rates ยท Password protected
Step 0
Pilot Readiness Check โ€” Complete Before Deploying Any Action
5 questions ยท 2 minutes ยท tells you where to start
โ–พ

Before running a single workshop, validate that the basics are in place. A pilot that launches without sponsor alignment or process clarity will produce noise, not results.

Q1
Does the CCO actively sponsor this initiative โ€” not just endorse it?
Q2
Is there a shared definition of "qualified lead" (MQL โ†’ SQL) that Sales and Marketing can both accept?
Q3
Have the 3 pilot markets committed one Sales and one Marketing person each for the duration?
Q4
Is IT available (even at limited capacity) to configure MS Dynamics for pilot workflows?
Q5
Is there agreement that the pilot will produce a visible "early win" result shared globally?
๐Ÿงญ
The real problem isn't the CRM โ€” it's that Sales and Marketing don't share a definition of a lead.
Inconsistent lead management is a process and culture problem first, a technology problem second. Pilots that lead with IT configuration before resolving the handover definition rarely achieve lasting adoption. The sequence that works: align on process โ†’ agree the data model โ†’ configure lightly โ†’ train and embed. Simple and used beats sophisticated and ignored.
โšก
๐Ÿ“
The rule: Lead harmonisation is not an IT rollout. It is a commercial alignment programme that uses technology as its backbone. Lead with process, follow with platform, embed with people.
๐Ÿ”„
On structure: The 3-phase plan is a safety net, not a schedule. Phase gates are go/no-go checkpoints โ€” not bureaucracy. If conditions allow, phases compress. If a gate reveals a problem, it's better to catch it at week 4 than fix it at week 12. I'd rather kill a bad launch early than rescue a live one. Pragmatist first, process second.
1
Problem Framing ยท Root cause before solutions PL
Define the 3 layers of the problem
The challenge operates at three levels simultaneously. Layer 1 โ€” Definition: "Qualified lead" means different things in every market, creating an invisible barrier between Marketing and Sales. Layer 2 โ€” Behaviour: Sales bypasses CRM (email forwarding); Marketing generates leads with no handover SLA. Layer 3 โ€” Visibility: Leadership cannot see pipeline health because data lives in inboxes, spreadsheets, and local tools. Solving Layer 3 without addressing Layers 1 and 2 first is unlikely to hold.
Success looks like: Every pilot market team can state โ€” in identical terms โ€” what makes a lead qualified and who owns it at each stage.
2
Key Principle ยท Design with, not for Both
Co-design the standard โ€” don't impose it
The sceptical market ("global standard won't fit us") and the impatient Sales manager are signals of a participation deficit, not a logic problem. The fastest path to adoption is to involve local Sales and Marketing leads in designing the standard process โ€” not presenting it to them. Run facilitated as-is โ†’ to-be workshops in each pilot market (not remote slide decks). The output is a jointly-owned process map that local teams believe is partly theirs. Co-ownership reduces resistance by an order of magnitude. Critically, co-design has a deadline: all markets must reach a working standard by end of week 3. If consensus fails, the CCO makes the tie-breaking call โ€” participation is offered, consensus is preferred, but the decision is not deferred indefinitely. This is agreed with the CCO in week 1.
Constraint awareness: With only one Sales and one Marketing person per market, workshop facilitation must be time-efficient. Use structured templates, not blank canvases.
Veto risk: A politically powerful Market Head can stall co-design under the guise of "local complexity." The CCO tie-break authority must be communicated before workshops begin โ€” not invoked as a surprise.
3
Key Principle ยท Minimum viable process first PL
Build the MVP lead process, not the perfect one
The pilot is not about building a world-class CRM. It is about proving that a simple, consistent lead process works better than the current inconsistency. The MVP has four elements: (1) agreed MQL/SQL definitions, (2) a lead entry point in MS Dynamics, (3) a handover trigger with a 48h SLA, (4) a basic dashboard showing leads by status. Everything else is phase 2. Tool-agnostic means: configure what's already licensed before requesting new tools.
Success looks like: All pilot markets use the same 4-stage lead pipeline in Dynamics within 8 weeks of kick-off, with daily active usage from both Sales and Marketing.
4
Key Principle ยท Adoption is the product Both
Make adoption visible and reward it
The brief asks for a pilot that makes "local organisations want more." Adoption metrics should be as visible as process metrics. Track CRM usage, lead entry compliance, and handover SLA adherence alongside conversion rates. Celebrate early wins โ€” a market's first digital lead converted under the new process is worth sharing. Use the feedback loop to surface issues quickly and resolve them in short cycles. The influential Sales manager is an asset if engaged early.
Facilit8 principle: Change that sticks is change that people chose. Make the new way the easier way, not just the mandated way.
5
Scale design ยท Built-in from day one CCO
Design the pilot so scale is the obvious next step
Every artefact โ€” process maps, CRM configuration, training materials, SLA templates โ€” is documented as a reusable, market-agnostic asset. Pilot markets become internal advocates and peer coaches for the next wave. A retrospective at week 14 surfaces improvement areas before they compound. The CCO's live dashboard is the proof point that supports global scale approval.
Success looks like: At week 16, the CCO has a live view of lead status across all 3 markets and a clear plan to onboard the next wave of markets in the following quarter.
6
Selection criteria ยท Not all markets are equal PL
Choose pilot markets deliberately โ€” four criteria
Criterion 1 โ€” Willing Market Head: Active participation, not volunteered by a Cluster Head. Selection criteria are agreed with the CCO in week 1 โ€” before Cluster Heads are consulted โ€” giving the PL standing to question any nomination without it becoming a day-one political act.

Criterion 2 โ€” Some existing CRM usage: Markets starting entirely from zero add configuration complexity that obscures process learnings. A partial Dynamics footprint is sufficient.

Criterion 3 โ€” Manageable scale and clean conditions: Avoid markets that are large by revenue, customer base, or headcount โ€” the 16-week window requires contained complexity. Also exclude markets with competing change programmes: ERP harmonisation, active acquisition integration, an existing transformation pilot, or significant leadership transition. A region with heavy acquisition activity and a parallel ERP rollout carries too many variables to produce clean learnings.

Criterion 4 โ€” Balanced portfolio: Prefer 2 markets with straightforward conditions and 1 with a defined degree of challenge. Challenge is assessed against observable factors: a sceptical Market Head on record, below-average CRM usage relative to other candidates, or a history of low participation in previous global initiatives. The PL scores each candidate on a simple grid before presenting a shortlist to the CCO. If other criteria already introduce difficulty, all 3 markets can be straightforward.
Selection risk: Cluster Heads may nominate compliant markets rather than representative ones. The PL should validate each market against these four criteria before confirming the selection.
๐Ÿ“‹
๐Ÿ“
Structure: 3 phases โ€” Discover & Design (Wks 1โ€“4), Build & Pilot (Wks 5โ€“12), Embed & Scale-Prep (Wks 13โ€“16). Each phase has clear entry criteria, deliverables, and a milestone gate.
๐Ÿ” Phase 1 โ€” Discover & Design (Weeks 1โ€“4)
Phase 1 Foundation
WP1.1 โ€” As-Is Process Mapping (Wks 1โ€“2): Facilitated workshops in each of the 3 pilot markets. Document current lead sources, qualification criteria, CRM usage, and handover points. Identify the 3 biggest improvement areas per market. Output: As-Is process map ร— 3 markets.

WP1.2 โ€” Global Standard Design (Wks 2โ€“3): Synthesise market findings. Co-design a standard 4-stage lead pipeline (New โ†’ MQL โ†’ SQL โ†’ Opportunity) with global Marketing and pilot market leads. Agree MQL/SQL definitions. Output: Standard Lead Process v1 + MQL/SQL definition document.

WP1.3 โ€” CRM Data Model & IT Brief (Wks 3โ€“4): Translate process to MS Dynamics field requirements. Write a lightweight IT configuration brief (not a full spec). Agree with IT on delivery timeline within budget envelope. Output: IT brief, Dynamics configuration scope, resource sign-off.

WP1.4 โ€” Stakeholder Alignment (Wks 1โ€“4, parallel): CCO briefing at kick-off. Market Head 1:1s. Cluster Head update. Change communication plan drafted.
Success looks like: By end of week 4, all pilot market Sales and Marketing leads have signed off the standard process and the IT brief is approved.
Phase gate: Moving into Phase 2 works best once all 3 markets have signed off the standard process and the IT brief is in place. This checkpoint is worth protecting โ€” a week's patience here typically saves several weeks of rework later.
๐Ÿ”ง Phase 2 โ€” Build & Pilot (Weeks 5โ€“12)
Phase 2 Core Delivery
WP2.1 โ€” CRM Configuration (Wks 5โ€“7): IT configures MS Dynamics per brief. PL reviews with market representatives at week 6 checkpoint. UAT with 2 users per market. Output: Configured Dynamics pipeline live in UAT.

WP2.2 โ€” Training Development (Wks 6โ€“7): Build lightweight training pack (1-pager process guide + 30-min live session per market). Translate core materials into market languages where needed. Output: Training pack + facilitator guide.

WP2.3 โ€” Go-Live Market A (Wk 8): First market goes live. PL on-site or high-touch remote for launch week. Daily check-in for 2 weeks. Collect feedback log.

WP2.4 โ€” Go-Live Markets B & C (Wks 9โ€“10): Staggered launch using lessons from Market A. Market A peer-advocates briefed. 48h SLA tracked from day 1.

WP2.5 โ€” Dashboard & Reporting (Wks 8โ€“12): Activate lead status dashboard for CCO visibility. Weekly pipeline report template live. Output: Live CCO dashboard.
Success looks like: By end of week 12, all 3 markets are logging leads in Dynamics, the 48h SLA is being tracked, and the CCO dashboard shows data from all markets.
IT dependency: Configuration must be complete by week 7. Any IT delay compresses training time โ€” flag early and escalate to CCO if needed.
๐Ÿš€ Phase 3 โ€” Embed & Scale-Prep (Weeks 13โ€“16)
Phase 3 Both
WP3.1 โ€” Adoption Review & Improvement (Wks 13โ€“14): Review CRM usage rates, SLA compliance, and qualitative feedback across all 3 markets. Run a lightweight retrospective. Identify top 3 improvement areas. Implement quick fixes within existing configuration (no new IT scope).

WP3.2 โ€” Early Results Report (Wk 14โ€“15): Compile pilot results: lead volume, conversion rate, SLA compliance, qualitative adoption scores. Frame as "proof of concept" narrative for CCO and board. Output: 1-page results summary + 5-slide CCO deck.

WP3.3 โ€” Scale Playbook (Wk 15โ€“16): Document all reusable assets: process maps, CRM configuration guide, training materials, SLA templates, onboarding checklist for new markets. Identify 5 candidate markets for next wave. Output: Scale playbook v1.

WP3.4 โ€” Pilot Close & Handover (Wk 16): Formal pilot close meeting with CCO and cluster heads. Hand process ownership to designated Market Process Owners. Agree next-wave timeline.
Success looks like: At the pilot close, the CCO endorses the scale playbook and at least 2 of the 3 pilot markets have a nominated Process Owner who can support onboarding of new markets.
๐Ÿ‘ฅ
๐Ÿ’ฐ
Budget envelope
CHF 75k total ยท 40 external consultant days ยท tight but achievable
The budget is sufficient for a lean, well-managed pilot โ€” but leaves no margin for scope creep. The PL role is the primary cost control mechanism. All external days must be pre-approved against specific work packages. IT time is the scarcest internal resource and must be protected via a clear brief and locked configuration scope.
Internal Resource Allocation
PLBoth
RoleWhoCommitmentKey responsibilities
Project Leader (PL)YouFull-time, 16 weeksProgramme management, facilitation, stakeholder management, scale design
Sales Representative1 per pilot market (ร—3)~20% / 2 days/weekAs-is input, UAT, go-live ambassador, feedback collection
Marketing Representative1 per pilot market (ร—3)~20% / 2 days/weekAs-is input, lead source documentation, training delivery support
IT (MS Dynamics)Shared resource~15 days total (protected)Configuration per brief, UAT support, dashboard setup
CCOSponsor2โ€“3 hrs/monthEscalation, global endorsement, scale sign-off
Global Marketing LeadProcess co-owner~10% / 4 hrs/weekMQL/SQL definition, training content sign-off
Capacity risk: Market-level Sales and Marketing reps carry day-jobs alongside this. The 20% estimate is optimistic during peak sales periods โ€” build buffer in weeks 8โ€“10.
External Consultant Day Allocation (40 days / CHF 75k)
Budget governed
Work PackageDaysApprox. CHFRationale
Process design facilitation (3 markets ร— as-is + to-be workshops)10~20,000Skilled facilitation is the highest-leverage spend
CRM configuration & IT support (Dynamics setup, UAT)12~22,000IT is internally constrained โ€” external cover for configuration and testing
Training design & delivery support6~11,000Build once, adapt ร—3 markets
Project management & coordination support5~9,000Admin, scheduling, status reporting for PL
Scale playbook & documentation4~7,000Reusable assets for markets 4โ€“23
Reserve / contingency3~6,000Scope creep buffer โ€” do not pre-allocate
Total40~75,000
Success looks like: External days are consumed on high-leverage activities (facilitation, configuration, training) โ€” not on coordination and admin, which the PL handles directly.
Rate stress-test: The blended rate of ~CHF 1,875/day is conservative. Specialist MS Dynamics consultants in European markets typically run CHF 2,200โ€“2,800/day. If IT rates are higher, the flex model is: maximise the 15 internal IT days first, use external days only for tasks internal IT cannot cover, and shift facilitation days to PL-led sessions. The contingency reserve absorbs rate variance.
Partner investment rates: Some implementation and facilitation partners will offer reduced rates during a pilot โ€” treating it as an investment in the full rollout. A successful 3-market pilot with a clear scale path to 20+ markets is a commercially attractive prospect for a partner. It is worth exploring reduced rates explicitly during partner selection: lower pilot costs free up days that can be reinvested into deeper training, additional market coverage, or a stronger scale playbook โ€” all of which increase the probability that the full rollout proceeds and that the partner is part of it.
๐Ÿ“…
โš ๏ธ
Timeline principle: Phase 2 cannot begin without Phase 1 gate sign-off. A 1-week slip in process design is recoverable. A slip in CRM configuration (WP2.1) risks the go-live date for all 3 markets.
16-Week Milestone Timeline
Full pilot view
WeekPhaseKey ActivityMilestone / GateWho
Wk 1Phase 1CCO kick-off, project charter confirmed, market kick-off calls๐Ÿšฉ Project launchedPL + CCO
Wk 2Phase 1As-is workshops: Markets A, B, C (facilitated)As-is maps completePL + ext. facilitator
Wk 3Phase 1Global standard design workshop (remote); MQL/SQL definition agreedStandard process draft v1PL + Global Mktg
Wk 4Phase 1IT brief finalised; market sign-off on standard process; CCO update๐Ÿšฉ Phase 1 Gate: Process approvedPL + IT + CCO
Wk 5Phase 2IT begins Dynamics configuration; training design startsConfiguration sprint beginsIT + ext. consultant
Wk 6Phase 2Mid-config review with market reps; training pack draftedConfig checkpoint (no surprises)PL + IT
Wk 7Phase 2UAT in all 3 markets; training pack finalised๐Ÿšฉ UAT signed off โ€” all marketsMarket reps + PL
Wk 8Phase 2Market A go-live; training delivered; PL high-touch support๐Ÿšฉ Market A livePL + Market A team
Wk 9Phase 2Market B go-live; Market A feedback loop active๐Ÿšฉ Market B livePL + Market B team
Wk 10Phase 2Market C go-live; CCO dashboard activated๐Ÿšฉ Market C live + dashboard livePL + IT + Market C
Wk 11Phase 2First full week: all 3 markets active; SLA tracking beginsFirst 48h SLA data availablePL monitors
Wk 12Phase 2Phase 2 adoption review; qualitative interviews with market repsAdoption health checkPL
Wk 13Phase 3Retrospective with all market teams; top improvement areas identifiedImprovement log + quick fixesPL + all markets
Wk 14Phase 3Quick fixes deployed; early results report draftedResults report v1PL + ext. consultant
Wk 15Phase 3Scale playbook drafted; next-market candidates identified; CCO previewScale playbook v1PL
Wk 16Phase 3Pilot close meeting; process ownership transferred; scale approved๐Ÿšฉ Pilot closed โ€” scale greenlitPL + CCO + Market Heads
Success looks like: All 5 milestone gates (๐Ÿšฉ) are hit within 1 week of target, and the scale decision is made by the CCO at week 16 without further escalation needed.
โš ๏ธ
Risk Register โ€” Pilot Level
Call out early
RiskLikelihoodImpactMitigation
Sceptical market refuses standard process
"Global standard won't fit us"
HighHigh Co-design the standard with that market's reps. Build in a documented "local variant" allowance for genuinely unique cases โ€” governed by the Process Owner and Global Marketing Lead, not open-ended.
IT overloaded โ€” configuration delayed HighHigh Allocate external consultant days to support IT (WP2.1). Agree and document the configuration scope at week 4 โ€” changes after that point go through a formal review rather than being absorbed quietly. If IT capacity becomes constrained, the PL raises this with the CCO early so resourcing options can be explored.
Influential Sales manager creates parallel process MediumHigh Enrol this person as a co-designer and early tester. Give them visible credit for the process. Make them a market go-live champion โ€” their buy-in is more powerful than any mandate. Structural back-stop: if behavioural enrolment fails, remove the parallel path โ€” leads arriving by email are logged by the Marketing rep on their behalf, then shown in the dashboard. Their manager (Market Head) sees adoption data weekly. The calculus changes when inaction is visible.
Market reps pulled back to core roles under pressure HighMedium Formalise the 20% commitment in writing with Market Heads before kick-off. Build 2-week buffer into go-live dates. Design all workshop and training formats to be 2-hour maximum.
MQL/SQL definition not agreed across markets MediumHigh Run the global standard design workshop with all 3 market reps present. Use a facilitated template โ€” not a blank sheet. CCO makes the tie-breaking call if markets cannot agree.
Budget overrun on IT configuration MediumMedium The configuration scope is agreed and documented at week 4. The 3-day contingency reserve is held back deliberately for genuine variance โ€” not pre-allocated. Any additional requests are reviewed by the PL against the contingency before proceeding, keeping the budget within the agreed envelope.
Low adoption: teams use CRM but revert to email in parallel MediumHigh Where possible, make CRM the primary and simplest path โ€” not an additional layer on top of existing habits. Support managers in referencing the dashboard in their 1:1s rather than email reports. Adoption data is shared with Market Heads weekly so issues are visible and can be addressed early.
The risk that deserves the most attention: If the CCO's visible sponsorship fades after week 1, middle management will naturally deprioritise the pilot in favour of immediate operational pressures. Keeping the CCO actively engaged โ€” through a monthly 20-minute dashboard review โ€” is the single most protective action the PL can take throughout the programme.
๐ŸŽฏ
๐Ÿค
Engagement principle: Different stakeholders need different things. The CCO needs confidence. Market Heads need respect for their context. Sales and Marketing reps need to feel heard โ€” and to see the win quickly.
๐Ÿ‘”
CCO โ€” Chief Commercial Officer
Needs global visibility without getting into the weeds
The CCO is the primary sponsor and the scale decision-maker. They care about pipeline visibility, conversion improvement, and a credible path from pilot to global. Frame everything in commercial outcomes โ€” not CRM features. Give them a live dashboard they can show the board.
Invitation script
"[CCO name], I want to confirm the pilot design with you before week 2 starts. I'll show you the 3 markets, the timeline, and the one dashboard metric we'll use to prove success. 20 minutes. No prep needed."
For relationship-led cultures, add: "I've heard good things about your work with the clusters โ€” I'd love your read on how Market A's head typically responds to global initiatives."
๐ŸŒ
Market Head โ€” Sceptical Market
"Global standard won't fit us" โ€” fears loss of local autonomy
This person has seen global initiatives fail before because they ignored local context. They are not wrong to be cautious โ€” they need to see that their voice will shape the standard, not just receive it. Co-design is the unlock. Give them a seat at the table in week 3's global standard workshop.
Invitation script
"[Name], your market's experience is exactly what we need to get the standard right. I'd like your team to help design the process โ€” not just test it. Can we set up a 90-minute workshop in week 2?"
For relationship-led cultures: "I've been told your market has the most sophisticated local setup โ€” I want to make sure we learn from that before we build anything."
๐Ÿ’ผ
Influential Sales Manager
Impatient โ€” wants results, not process discussions
This person's informal authority can make or break adoption in their market. They will test the new process by whether it makes their job easier, not by whether it's strategically aligned. Show them a quick win โ€” a lead that converts faster under the new process. Make them the go-live champion.
Invitation script
"[Name], I know you're under pressure to deliver. The pilot is designed to reduce the friction between you and Marketing โ€” and give you leads you can actually close. I need 2 hours from you in week 2. After that, the process works for you."
For relationship-led cultures: "I'd rather have your honest read on what's broken than guess from the outside โ€” this is your chance to fix it on your terms."
๐Ÿ’ป
IT Lead
Overloaded โ€” every project thinks it's urgent
IT's limited capacity is the most fragile dependency in the workplan. They need a locked, minimal scope brief โ€” not an open conversation about possibilities. Treat them as a delivery partner, not a service desk. Protect their time from stakeholder requests arriving outside the PL's channel.
Invitation script
"[Name], I'm writing a configuration brief this week that will lock scope before you start. 15 IT days, no scope changes once signed off. Can we align on the brief by end of week 3 so you can plan the sprint?"
For IT cultures: include a one-page technical requirements template rather than a narrative brief โ€” engineers prefer structure over prose.
Governance Model โ€” Comms & Decision Rights
All stakeholders
StakeholderCadenceFormatDecision right
CCOMonthly + ad hoc20-min review + live dashboardScale approval, budget escalation, tie-breaking
Global MarketingWeekly (async)Status update email + shared docProcess standard ownership, MQL/SQL definition
Cluster HeadsBi-weekly2-page written updateMarket resource allocation
Market HeadsWeekly (during go-live)15-min check-in callLocal resource, escalation to cluster
Market Sales/Mktg repsDaily (go-live weeks) โ†’ weeklySlack/Teams + weekly feedback formProcess feedback, local exceptions flagged
ITBi-weekly during Phase 2Sprint review meetingConfiguration decisions within agreed scope
Success looks like: No stakeholder is surprised by pilot progress. All decisions are made at the right level without requiring PL to escalate unnecessarily to the CCO.
16
Pilot weeks
3
Pilot markets
5
Milestone gates
10
New capabilities
40
Consultant days
8
Tabs covered
v6 โ€” facilit8 ยท Digital Transformation Series ยท 2026 ยท Password protected

Running a lead harmonisation pilot?

A 30-minute conversation with David can tell you whether this framework fits your situation โ€” or what to adapt for your markets.

Want this playbook by email?

Leave your email and I'll send you a copy โ€” no spam, unsubscribe anytime.